4.

C

213 S

inspected the Office which still being used notwithstanding its admitted unsafe condition, and then decided upon appointing a Committee to report as to what had best be done, taking all the circumstances into consideration, as to rebuilding on the present site or elsewhere, as to plans, &c. The Committee consisted of Mr Lowcock (a Member of the Legislative Council who from previous training as an Engineer was specially qualified to advise the Government upon such a subject), the Surveyor General and the Harbor Master. A copy of their report, in which I concurred, I enclose herewith.

7.

It is expected that the building will be erected for $30,000 of which amount $14,262, it is estimated, will be required for the foundations, which work is being done under a schedule of prices. The Office, however, will be built by contract and tenders will be called for, just as the foundations have been put up to the level of the ground, which will be the case at the end of June.

8.

Meanwhile, as the most economical arrangement for providing

Edit History

2026-05-21 02:43:53 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
4. C 213 S inspected the Office which still being used notwithstanding its admitted unsafe condition, and then decided upon appointing a Committee to report as to what had best be done, taking all the circumstances into consideration, as to rebuilding on the present site or elsewhere, as to plans, &c. The Committee consisted of Mr Lowcock (a Member of the Legislative Council who from previous training as an Engineer was specially qualified to advise the Government upon such a subject), the Surveyor General and the Harbor Master. A copy of their report, in which I concurred, I enclose herewith. 7. It is expected that the building will be erected for $30,000 of which amount $14,262, it is estimated, will be required for the foundations, which work is being done under a schedule of prices. The Office, however, will be built by contract and tenders will be called for, just as the foundations have been put up to the level of the ground, which will be the case at the end of June. 8. Meanwhile, as the most economical arrangement for providing
Baseline (Original)
4. C 213 S inspected the Office which still bring used notwithstanding it's admitted unsafe condition, and then decided upon appointing a Committee to report as to what had best be dove, taking all the circumstances into consideration, as to rebuilding site 6. f VY the present ge dsewhere, as to plans, V. & The Committee consisted Legislative Mr Lowcock (a Member of the lative Cemal who from previous training as an Inginer specially qualified to advise was the Government upen such a subject), this Surveyor General and the Harbor Master. A copy of Enclosure 1. 3 Septḥ 1872. their report, in which I concurred, I endose herewith. 7 It is expected that the building will be erected for $30,000 of which amount $14,262, it is estimated, will be required for the foundations, which work is being done schedule of prices. The Office, however, will be built by contract and Penders will be called for, ar a Just in the foundation have been puut up to the level of the ground, which will be the case at the and of June. 8. Meanwhile, as the most economical arrangement for providing
2026-05-21 02:43:53 · Baseline
View content

4.

C

213 S

inspected the Office which still bring used notwithstanding it's admitted unsafe condition, and then decided upon appointing a Committee to report as to what had best be dove, taking all the

circumstances into consideration,

as to rebuilding

site

6.

f

VY

the present

ge

dsewhere, as to plans, V. & The Committee consisted

Legislative

Mr Lowcock (a Member of the lative Cemal who from previous training as an Inginer specially qualified to advise

was

the Government

upen

such

a

subject), this Surveyor General and the Harbor Master. A copy of

Enclosure 1. 3 Septḥ 1872.

their

report, in which I concurred,

I endose herewith.

7

It is expected that the

building will be erected for $30,000 of which amount $14,262, it is estimated, will be required for the foundations, which work is being done

schedule of prices. The Office, however, will be built by contract and Penders will be called for,

ar

a

Just in

the foundation have been puut up to the level of the ground,

which will be the case at the and of June.

8.

Meanwhile, as the most economical arrangement for providing